Description
Galvanized Steel Scaffold Planks & Walkway Boards
Sino East provides industry-leading Galvanized Steel Scaffold Planks and Walkway Boards manufactured to EN 12811-1 safety standards. Featuring anti-slip pressed perforations and hot-dip galvanized (HDG) finish, our planks are the primary choice for commercial scaffolding companies, shipyard access platforms, and industrial maintenance crews demanding zero-compromise worker safety.
1. Manufacturing and Anti-Slip Technology
All Sino East steel scaffold planks are cold-rolled from high-strength Q235B structural steel. The anti-slip pattern is formed through a precision stamping process that creates raised dimples and drain slots—reducing accumulated water weight while maximizing friction underfoot. After stamping, each plank undergoes the hot-dip galvanization (HDG) process at 450°C to achieve an 80μm zinc coating, providing 25+ years of rust protection even in coastal and high-humidity climates.
2. Specification Table
| Parameter | Standard Value / Option |
|---|---|
| Material Grade | Q235B / S235JR structural steel |
| Plank Width | 210mm, 240mm, 300mm, 320mm |
| Plank Length | 1.5m, 2.0m, 2.5m, 3.0m (Custom available) |
| Thickness | 1.2mm / 1.5mm / 2.0mm |
| Surface Finish | Hot-Dip Galvanized (80μm HDG), Anti-Slip Stamped |
| Load Capacity | EN 12811-1 Class 2 / Class 3 certified |
3. Safety Standards & Certification
- EN 12811-1 — Temporary Works Equipment: performance requirements and general design.
- BS 2482 — Specification for timber scaffold boards (applicable load test methodology).
- HDG Certificate — Zinc coating thickness verification to ISO 1461.
- Load Testing Report — Third-party bend and slip resistance testing available on request.
4. B2B Wholesale FAQ
Do scaffold planks need to be galvanized or is painted sufficient?
For outdoor or coastal construction, only hot-dip galvanized (HDG) planks are recommended. Painted planks will develop red rust within 6-12 months in humid conditions, creating slip hazards and premature replacement costs. HDG provides 25+ years of corrosion protection.
What is the typical lead time for bulk scaffold plank orders?
Standard dimensions (210mm x 3m) are kept in rotating stock and can be loaded within 5-7 working days. Custom widths or heavy-duty 2.0mm gauge planks require 15-20 days production time.
Can I order mixed container loads with scaffolding tubes and fittings?
Absolutely. We consolidate steel planks, scaffolding standards (vertical poles), ledgers, and couplers in a single 40HC container to optimize your landed cost. Contact our sales team with your bill of materials (BOM).








