How to scientifically arrange the production of spiral steel pipes
The production of spiral steel pipe is due to its slow adjustment process and fast production. Under normal circumstances, it is not often adjusted, because the adjustment generally requires a half-sound time. If it is produced, this half-sound can produce about 30 tons of steel pipes, which directly affects the production cost. Under the condition of large contract volume, how to scientifically and reasonably arrange production? Spiral steel pipe production is generally arranged in order of increasing according to the number of contracts, from small to large, so that the adjustment time can be shortened and the output can be increased.
If there are raw materials in the contract with the same width, first adjust according to the type of spiral steel pipe with the same plate width. If the plate width is the same, adjust the shape according to the wall thickness of the raw material closest to the online plate. If a single standard of several tens of tons of spiral steel pipe is generally not produced alone, because the time of adjusting the shape takes half a sound, the production time is also half a sound, plus the cost of lost work, and then remove the spiral steel pipe forming parts, tail pieces, etc. Loss, the cost of the spiral steel pipe is at least 200 yuan per ton, and the company will lose money at the normal price.
Under the premise of high price transparency of the spiral steel pipe, as long as the production of the spiral steel pipe is scientifically scheduled, it can avoid the negative profit gap and ensure that the spiral steel pipe can complete the task in accordance with the established specifications with quality and quantity. Steel jacketed steel insulation steel pipe is a kind of hot water that can transport hot water higher than 140 degrees Celsius or high temperature and high pressure steam. Because of its high strength, steel jacketed steel insulation pipe is welded and connected, and the reliability of waterproof sealing function is very high. In addition, its resistance to The high temperature function is also incomparable with other external maintenance pipes.